MECHVAC have designed, manufactured and installed an air conditioning system for the Orora Glass Bottling Plant at Gawler SA. This factory manufactures 1.5 million bottles per day. This system is for cooling 15,000 m2 of factory space and consists of 15 air conditioning units with supply air distribution ductwork to reach into the middle of the factory.

This project is a design and construct contract which is currently in progress with stage 1 works completed in July 2015. Stage 2 works are anticipated to commence in 2016.


Customer Benefits and Project Outcomes

  • Airconditioning plant for operator comfort for relief in summer conditions with nearby glass furnaces.
  • Provide positive pressure air control for a food safe factory environment for dust and insect pest control
  • Turnkey project delivery
  • On time delivery
  • On budget, no cost overruns
  • Zero lost time injuries
  • Less than 0.5% non-conformances