Orana Cleanroom

Mechav Engineering Images

Orana Cleanroom

MECHVAC Engineering has completed a major project for Orana in November 2015 at their Netley facility for an Olive Oil Packaging Cleanroom.

This project involved;

  • Plant layout design
  • Design of cleanroom construction
  • Design of air conditioning system
  • Manufacture of cleanroom and ductwork
  • Installation of cleanroom, air conditioning and electrical power and control.

This facility was designed as a fully sealed environment for the safe and hygienic packaging of olive oils on a bottling line and a canning line. This will ensure Orana can achieve HACCP accreditation for their facility and provide their clients with a risk free product.

Scroll to Top