Redarc

MECHVAC designed, manufactured and installed a cleanroom upgrade to the Redarc Electronics site at Regency Park SA. The plant upgrade consisted of:

  • 200 m2 extension to existing Cleanroom facility. The facility was extended whilst the existing cleanroom and adjacent work cells remained in production
  • Refrigerative reverse cycle air conditioning unit roof mounted
  • HEPA filtered air supply system to cleanroom
  • Electrostatic discharge vinyl flooring throughout
  • Fume extraction system for connection to plant equipment
  • All plant services for power distribution, compressed air, equipment earthing, chilled water and Nitrogen gas supply
  • Relocation of a main access corridor
  • Council approvals and Building Rules Certification

This project was completed in March 2024.

Customer Benefits and Project Outcomes:

  • Cleanroom expansion to increase manufacturing capacity for surface mount printed circuit board manufacture
  • Designed for AS/NZS/ISO 146 44.1 class 7 running conditions
  • Turnkey project delivery