Lachlan Hunt

Mechav Engineering Images

Treatment Plant

MECHVAC designed, manufactured and installed ventilation equipment at the Bolivar Waste Treatment Plant. New exhaust and supply air systems were installed to the main Digester Plant in order to provide a safe working environment by removing hazardous fumes. All ductwork and support steelwork was manufactured by MECHVAC in our workshop. Explosion proof centrifugal and axial […]

Treatment Plant Read More »

Mechav Engineering Images

Heating Ovens

MECHVAC designed, manufactured and installed 8 heating ovens for the Holden Assembly Line. These ovens are used to heat wiring harnesses, looms and decklid seals in cold weather to 45 deg C to make them flexible as an ergonomic aid for the assembly process. These projects were design and construct contracts that were completed on

Heating Ovens Read More »

Mechav Engineering Images

Grinding Room

MECHVAC designed, manufactured and installed a Grinding Room for a defence industry shipyard. The scope of works included extraction / exhaust systems, lighting, power, compressed air and commissioning. This project was a design and construct contract that was completed on time in October 2013. CUSTOMER BENEFITS AND PROJECT OUTCOMES WHS and ergonomic improvements for operator

Grinding Room Read More »

Mechav Engineering Images

Crushing Plant

MECHVAC has installed an ore crushing and blending plant for Bureau Veritas Minerals using Lean Manufacturing Plant Layout principles. Significant improvements can be readily made for existing or new operations with a lean process design approach that MECHVAC is ready to assist with. Lean manufacturing principles are centred on the minimisation of process waste and

Crushing Plant Read More »

Mechav Engineering Images

SX Plant

MECHVAC designed, manufactured and installed a $1m SX (Solvent Extraction) mixer settler mini Pilot Plant for Bureau Veritas Minerals. This plant is an extension of the Cribs facility for the heap leach technology demonstration project for BHP Billiton Olympic Dam installed by MECHVAC in 2012. This facility consisted of platforms, mixer settler tanks, pumps, reticulation

SX Plant Read More »

Mechav Engineering Images

Precipitation Plant

MECHVAC designed, manufactured and installed an Ammonium Precipitation Pilot Plant facility for Bureau Veritas Minerals. This plant is an extension of the Cribs facility for the heap leach technology demonstration project for BHP Billiton Olympic Dam installed by MECHVAC in 2012. This facility consisted of a mounting skid, titanium precipitation tanks, pumps, reticulation pipework, power

Precipitation Plant Read More »

Mechav Engineering Images

Column Leach Plant

MECHVAC designed, manufactured and installed a two storey Column Leaching Platform. New reverse cycle factory air-conditioning and plant services were also designed and installed by MECHVAC. All ductwork and platform steelwork was manufactured and installed by MECHVAC. This project was a complete turnkey design and construct contract that was completed on time in October 2014.

Column Leach Plant Read More »

Mechav Engineering Images

Crib Leach

A major new project by MECHVAC to design and install a turnkey Crib Leaching Facility at Bureau Veritas has just been completed. MECHVAC were engaged by Bureau Veritas to design and install this facility from the concept design stage. The crib steel work components and associated platforms, tanks and pipework were manufactured at MECHVAC’s Pooraka

Crib Leach Read More »

Mechav Engineering Images

Dust Extraction

Project successfully completed in 2018 for Cheetham Salt – replacement of old wet scrubber system with two new MECHVAC designed wet scrubbers allowing an upgrade in factory capacity for future factory improvements. This system was also designed to significantly improve environmental performance and replace an old system which produced excessive exhaust carry over and pollution.

Dust Extraction Read More »